Leila and Sam Barker will soon see their lender’s valuer visit the Leeds house they have agreed to buy for £330,000. The valuer will tell the lender whether the house supports their £295,000 loan, but will not report on the roof or the damp. Their buildings insurance must be set at the £220,000 it would cost to rebuild the house, not the £330,000 price or the £295,000 loan.
Key facts
- Price, market value and reinstatement value serve different purposes: the contract, the loan and the buildings sum insured.
- The sum insured follows the rebuild cost, not the market value, the mortgage balance or an average of the two. Under an average clause the insurer pays the claim multiplied by sum insured over rebuild cost.
- A mortgage valuation protects the lender and is not a survey; choose RICS Level 1, 2 or 3 to fit the property.
- At auction the contract binds when the hammer falls, with a 10% deposit and completion about 20 business days later.
- First-time buyer relief is lost above £500,000; review rebuild cost at each renewal and after building work.
Key terms
- Reinstatement value
- The cost of rebuilding a property after total loss, including demolition, site clearance and fees, and excluding the land.
- Mortgage valuation
- The lender’s check that a property is adequate security for the loan; it is not a survey.
- RICS Home Survey
- A buyer’s survey at Level 1, 2 or 3, chosen according to the age, type and condition of the property.
- Average clause
- A policy term that reduces a claim in proportion to the underinsurance: sum insured divided by rebuild cost.
Common exam trap
The trap: The sum insured should be the average of market value and rebuild cost, or the market value, to protect the land too.
Buildings insurance pays the cost of reinstatement. Fire and flood do not destroy land, so the rebuild cost can sit far below market value, and cover above it is paid for but never claimed.
Why it matters: Rebuild cost moves with labour and materials, not with the housing market.
Worked calculation: When the valuation is below the price
Yusuf and Amira Hakim agree to buy a house for £360,000 and apply for a 90% loan of £324,000. The lender values the house at £345,000 and lends up to 90% of the lower of price and valuation.
Step 1: Maximum loan
£345,000 × 90%
= £310,500
The valuation is lower, so it sets the loan.
Step 2: Loan shortfall
£324,000 − £310,500
= £13,500
This is the extra cash needed beyond their planned £36,000 deposit.
Answer: The Hakims must find an extra £13,500, a deposit of £49,500 in all, unless the price falls.
The £15,000 gap between price and valuation is not the shortfall: the loan falls by 90% of £15,000, which is £13,500.
3 practice questions
These come from the 12-question topic quiz. Pick an answer, then open the explanation.
Question 1
Catherine’s house has a market value of £340,000. An insurer estimates that it would cost £260,000 to rebuild. What should her buildings sum insured be based on?
- A£340,000, the price a buyer would pay for the house and its land
- B£300,000, the average of the market value and the rebuild estimate
- C£260,000, the estimated cost of rebuilding it
- D£80,000, the difference between the market value and the rebuild cost
Show the answer
Answer: C
Reinstatement value is the cost of rebuilding the property, including professional fees and clearing the site, and buildings insurance is based on it. Market value includes the land and the location and can be higher or lower than the rebuild cost. Averaging the two or using the difference has no basis, and neither would cover the cost of rebuilding after a total loss.
Question 2
Femi has found an online automated valuation estimate of £350,000 for a house he wants to buy and proposes to rely on it alone. What should the adviser say?
- AIt is acceptable, because automated valuations are regulated by the FCA as accurate
- BIt is acceptable, provided that the estimate is no more than 12 months old
- CIt is unnecessary, since the lender’s valuation will always match the asking price
- DIt is a statistical estimate with no inspection, so a formal valuation is needed
Show the answer
Answer: D
An automated valuation model estimates value from data on similar sales and does not involve a surveyor inspecting the property, so it can miss condition, extensions or local factors. A buyer committing to a large purchase should take a valuation or survey. AVMs are not guaranteed by the FCA, and lenders can value below the asking price.
Question 3
When should an adviser prompt a customer to obtain value or survey advice instead of simply pressing ahead?
- AWhen value or condition looks uncertain and the customer could suffer a loss
- BOnly when the customer asks for a survey, because the choice is theirs alone
- COnly when the lender requires a survey, because the lender decides what is needed
- DWhen the property is more than five miles from the customer’s current home
Show the answer
Answer: A
Treating customers fairly means pointing out risks the customer may not see. If the property’s age, defects, price or tenure make the value or condition uncertain, the adviser should recommend advice before the customer commits. Waiting for the customer to ask, or for the lender to require it, leaves them exposed, and distance from their current home is irrelevant.
Test yourself
A house has a market value of £520,000 and a rebuild cost of £240,000. What should the buildings sum insured be based on?
The £240,000 rebuild cost, because market value includes land that is not destroyed.
A home costs £400,000 to rebuild but is insured for £300,000. A burst pipe causes £16,000 of damage. What does the insurer pay under average?
The proportion insured is £300,000 ÷ £400,000 = 75%, so the insurer pays £16,000 × 75% = £12,000.
A buyer agrees £250,000 and applies for 80% of the price. The lender values the property at £240,000 and lends 80% of the lower figure. How much extra cash is needed?
The loan applied for was £200,000, but the lender offers 80% × £240,000 = £192,000, so the buyer must find an extra £8,000.
Sources
- CeMAP syllabus, LIBF / Walbrook Institute London (March 2026)
- Reinstatement cost assessment of buildings, 3rd edition, Royal Institution of Chartered Surveyors
- RICS Valuation: Global Standards (Red Book), Royal Institution of Chartered Surveyors
- House surveys (UK): the costs, types and benefits of an RICS Home Survey, Royal Institution of Chartered Surveyors
- How to buy a home, GOV.UK
- Stamp Duty Land Tax: residential property rates, GOV.UK
- RICS Common Auction Conditions (as published by an auctioneer), Royal Institution of Chartered Surveyors
- PRIN 2A The Consumer Duty, Financial Conduct Authority
- FG21/1 Guidance for firms on the fair treatment of vulnerable customers, Financial Conduct Authority
Reviewed on 30 Oct 2026. Next review due 6 Apr 2027. Written by Archway Learn from the LIBF syllabus and the sources above.