Leila and Sam Barker have agreed to buy a £330,000 house in Leeds and have a £35,000 deposit ready. Suppose the lender’s valuer reported damp and timber decay and valued the house at £312,000. Their income would be unchanged, yet the lender would lend less.

Key facts

  • A lender needs the borrower to afford the loan and the property to be adequate security. Strong affordability does not remove a security concern.
  • The loan is a percentage of the lower of price and valuation. After a down-valuation the price stays the same, so the buyer funds the gap.
  • A defect can lower the maximum loan-to-value as well as the valuation.
  • A retention holds back part of the advance until works are checked. Where the cause is unknown, the lender defers and asks for a specialist report.
  • Buildings insurance must be in place by completion and kept for the whole term, or completion cannot go ahead.
  • Japanese knotweed is judged by RICS management category (A to D). Defective PRC houses need approved repairs and a certificate.
  • Tell customers plainly how defects affect cost, timing and lending before they are committed.

Key terms

Down-valuation
A valuation below the agreed price, which reduces the loan because the lender advances against the lower figure.
Retention
Part of the advance held back until specified works are completed and checked.
Loan-to-value (LTV)
The loan as a percentage of the property’s value or price, whichever is lower.
Buildings insurance condition
The lender’s requirement that adequate cover is in place by completion and maintained for the whole term.
Management category
The RICS rating of a Japanese knotweed infestation, from A (action) to D (report), that guides the lender’s response.
PRC certificate
Evidence that a defective precast reinforced concrete house has been repaired under an approved scheme.

Common exam trap

The trap: If the borrower can comfortably afford the instalments, the lender should ignore a recorded structural defect.

Affordability is one test and security is the other. A strong income does not remove a security concern, because the lender must be able to recover its money by sale.

The defect affects the property’s value and insurability, not the reliability of the borrower’s earnings.

Worked calculation: A down-valuation on the Barkers’ house

The Barkers agreed £330,000. Suppose the valuer reports £312,000, and the lender’s maximum is 90% of the lower of price and valuation. They have £35,000 and no other savings.

  1. Step 1: Take the lower figure

    = £312,000

    The valuation is below the price, so the valuation is used.

  2. Step 2: Maximum loan

    £312,000 × 90%

    = £280,800

    The loan is a percentage of the lower figure.

  3. Step 3: Own money needed

    £330,000 − £280,800

    = £49,200

    The price is unchanged, so the buyer funds the rest.

  4. Step 4: Shortfall against the deposit

    £49,200 − £35,000

    = £14,200

    This is the extra cash the Barkers do not have.

Answer: The maximum loan is £280,800 and the Barkers are £14,200 short.

If the seller cuts the price to £312,000, the loan stays £280,800 and the deposit needed is £31,200, which the Barkers can meet. Common slips are applying 90% to the price (£297,000) or subtracting the £18,000 shortfall from the price-based loan.

3 practice questions

These come from the 12-question topic quiz. Pick an answer, then open the explanation.

  1. Question 1

    Bronwen agrees to buy a house for £195,000. The lender values it at £178,000 because of foundation movement and offers a maximum of 85% of the lower of price and valuation. What is the most the lender will advance?

    1. A£151,300
    2. B£165,750
    3. C£178,000
    4. D£148,750
    Show the answer

    Answer: A

    Lenders advance against the lower of price and valuation, which is £178,000 here. 85% of £178,000 is £151,300. £165,750 is 85% of the price, which ignores the down-valuation, £178,000 treats the valuation as the loan, and £148,750 subtracts the £17,000 shortfall from the price-based figure, which is not how the maximum is set.

  2. Question 2

    A lender approves a £200,000 loan on Mei’s house but withholds £10,000 until roof repairs are finished and inspected. What is this arrangement called?

    1. AA higher lending charge, payable because the loan is large relative to value
    2. BAn early repayment charge, applied because the work is not yet complete
    3. CA deposit reduction, agreed because the seller will pay for the repairs
    4. DA retention, released once a valuer confirms the work has been done properly
    Show the answer

    Answer: D

    A retention is part of the advance held back until specified works are completed and checked. It protects the lender’s security while letting the purchase go ahead. A higher lending charge is a cost for high loan-to-value lending, an early repayment charge applies to early redemption, and a deposit reduction is a different mechanism altogether.

  3. Question 3

    A Home Survey on a house that Tilly wants to buy records no serious defects. What is the effect on the lending decision?

    1. AIt supports the security case, though affordability and insurance must still be met
    2. BIt obliges the lender to offer the highest loan-to-value ratio in its whole product range
    3. CIt removes the need for the lender to carry out its own valuation of the property at all
    4. DIt means buildings insurance is not required for the mortgage term
    Show the answer

    Answer: A

    A report without serious defect flags means the valuer is not pricing unresolved structural risk, so it supports the security assessment. It remains one input: the lender still needs to be satisfied on affordability, may carry out its own valuation, and requires buildings insurance throughout the term. It creates no entitlement to a particular loan-to-value ratio.

Test yourself

A buyer agrees £260,000 for a house valued at £250,000, and the lender’s maximum is 80% of the lower of price and valuation. What is the maximum loan, and how much of the buyer’s own money is needed?

80% × £250,000 = £200,000. The price is unchanged, so the buyer needs £260,000 − £200,000 = £60,000.

A lender offers £150,000 on a £200,000 purchase but retains £5,500 for rewiring. How much does the lender release at completion, and how much must the buyer fund?

It releases £150,000 − £5,500 = £144,500, so the buyer funds £200,000 − £144,500 = £55,500 at completion. The retention follows once a valuer confirms the work.

A valuer places a house in knotweed management category A. What do most lenders expect?

A specialist inspection and a treatment plan with an insurance-backed guarantee, usually with a retention, because damage has been caused.

Sources

Reviewed on 30 Oct 2026. Next review due 30 Oct 2027. Written by Archway Learn from the LIBF syllabus and the sources above.