CeMAP MRT1 revision notesReviewed

What can a lender do when a property needs remedial work?

Syllabus topic: Possible remedial works and actions lenders may take

In short

Gwen and Rhodri Lloyd, the Cardiff couple buying a £240,000 cottage in Pembrokeshire, receive a valuation that is positive but cautious. The valuer has noticed damp staining on a gable wall and wants the cause repaired before the lender will be comfortable. The Lloyds need to know what the lender can ask for and what evidence will satisfy it.

Key facts

  • A lender may require work before completion, hold a retention, accept an undertaking, ask for a specialist report, accept insurance, or decline; it may not ignore the valuer’s condition.
  • A retention is held back from the advance, so the amount released at completion is the advance less the retention.
  • The buyer must find the price less the amount released, which is the deposit plus the retention.
  • A retention is released once the lender is satisfied, usually after a reinspection by its valuer.
  • Remedies must fit the diagnosis: penetrating damp is repaired where water enters, not with a damp-proof course.
  • Structural movement calls for an engineer and proof of completion; past underpinning needs the engineer’s certificate and available subsidence cover.
  • A contractor-only guarantee has little value if the firm stops trading, so lenders prefer insurance-backed cover.
  • A price reduction does not oblige the lender to lend, and the adviser explains conditions before the customer is bound.

Key terms

Retention
Money the lender holds back from the advance until specified work or action has been completed to its satisfaction.
Undertaking
A written commitment by the borrower to carry out defined work by a set date.
Reinspection
A second visit by the lender’s valuer to confirm that required work has been completed.
Insurance-backed guarantee
A contractor’s guarantee supported by insurance, so cover continues if the contractor stops trading.
Indemnity insurance
Insurance against a defined legal risk, accepted by a lender where a full cure is not practicable.
Underpinning
Strengthening a building’s foundations after movement, evidenced by an engineer’s completion certificate.

Common exam trap

The trap: Once the builder says the work is finished, or the borrower is satisfied with it, the lender must release the retention.

The lender is not obliged to release a retention until the condition is fully satisfied to its own standard. That normally means evidence such as a reinspection by its valuer, and a statement from the borrower or the contractor does not meet it.

Worked calculation: The cash a retention takes from the buyer

Suppose the lender approves the Barkers’ £295,000 loan on the £330,000 house but holds back £7,500 until the roof is repaired. They have a £35,000 deposit and no other savings.

  1. Step 1: Amount released at completion

    £295,000 − £7,500

    = £287,500

    The retention is deducted from the advance paid at completion.

  2. Step 2: Cash the buyers must find

    £330,000 − £287,500

    = £42,500

    The deposit is £35,000, plus the £7,500 the lender is holding back.

  3. Step 3: Shortfall against their deposit

    £42,500 − £35,000

    = £7,500

    This is the extra money needed on the day.

Answer: The Barkers need £42,500 at completion and have a £7,500 gap, which they recover only after the roof is repaired.

Ignoring the retention suggests £35,000 is enough, but the buyer funds the retained amount first.

3 practice questions

These come from the 12-question topic quiz. Pick an answer, then open the explanation.

  1. Question 1

    A lender agrees an advance of £178,500 on Callum Dyer’s purchase but holds back a £6,000 retention for roof repairs. How much of the advance is released at completion?

    1. A£184,500, which is the advance plus the retention
    2. B£178,500, which is the full advance as offered
    3. C£172,500, which is the advance less the retention
    4. D£6,000, which is the amount that is held back
    Show the answer

    Answer: C

    A retention is money the lender holds back from the advance until specified action is performed, as described in the UK Finance Mortgage Lenders’ Handbook. Only £172,500 is released at completion, and the £6,000 follows once the works are done to the lender’s satisfaction. Adding the retention, releasing the whole advance or releasing only the retention misreads how it works.

  2. Question 2

    A valuer says a £250,000 house needs £10,000 of repairs, and the seller agrees to cut the price to £240,000. What is the lender’s position?

    1. AIt must lend on the new price, because the defect has now been reflected in what the buyer pays
    2. BIt must drop the retention, because the price cut has already compensated the buyer for the repairs
    3. CIt still decides whether to accept the security at the new price, and may keep its conditions
    4. DIt must treat the £10,000 price cut as an extra deposit and increase the amount it lends
    Show the answer

    Answer: C

    A price reduction or seller contribution can realign the economics of a purchase with the defective condition, but the lender still has to accept the property as security at that price. A retention, specialist report or even a decline can remain on the file. The price cut does not oblige the lender to lend or to waive conditions.

  3. Question 3

    Which of the following is NOT an action a lender may take when a valuer reports a defect?

    1. AAdvance in full while ignoring the condition the valuer recommended
    2. BHold back a retention until the specified works have been completed
    3. CRequire the works to be completed and evidenced before it will complete
    4. DDecline to lend against the property if the security cannot be made acceptable
    Show the answer

    Answer: A

    A lender relies on the valuer’s report to decide whether the property is acceptable security. It may require works before completion, hold back a retention until works are evidenced, or decline the security. Advancing in full while ignoring a recommended condition would put the lender’s charge on a property that the valuer has not accepted, so it is not a recognised action.

Test yourself

A lender advances £142,000 on a house and holds back £4,000 for window repairs. How much is released at completion, and what does the buyer find if the price is £160,000?

£138,000 is released (£142,000 − £4,000), so the buyer finds £160,000 − £138,000, which is £22,000 of their own money.

A borrower asks to complete first and rewire later. What will the lender typically take instead of seeing the work done?

A written undertaking to complete defined work by a set date, usually with a reinspection or a hold-back so the lender can check it.

A surveyor reports condensation on bedroom walls caused by poor ventilation. Which remedy fits?

Better ventilation and heating, because condensation comes from moisture inside the room. A damp-proof course or waterproof paint would not remove the cause.

Sources

Reviewed on 30 Oct 2026. Next review due 29 Oct 2027. Written by Archway Learn from the LIBF syllabus and the sources above.