CeMAP MRT1 revision notesReviewed
What guarantee schemes cover new homes?
Syllabus topic: Guarantee schemes for new homes
In short
Ken Osei, a 52-year-old engineer from Nottingham, has bought a building plot at auction and plans to self-build a house at a cost of £250,000. His lender will want to know what protects the finished house if the structure fails later. The answer is a structural warranty.
Key facts
- A new-home warranty moves construction risk away from the buyer and gives the lender protection for its security.
- Buildmark has three stages: insolvency cover from exchange to completion, a two-year builder warranty, then eight years of insurance.
- Report defects to the builder in years one and two; from year three, defined structural damage is claimed from NHBC.
- The warranty excludes insured perils, wear and tear, neglect, later alterations and snagging, and remaining cover passes to later owners.
- No central list of acceptable schemes exists; each lender names its own in the Handbook. Missing required cover means delay or decline until an accepted scheme or a PCC is in place.
Key terms
- NHBC Buildmark
- A ten-year new-home product: insolvency cover to completion, a two-year builder warranty, then eight years of insurance for defined damage.
- Builder warranty
- The first two years after completion, in which the builder must put right defects that breach the scheme’s requirements.
- Snagging
- Minor unfinished items found at a pre-completion inspection, which the developer puts right outside the warranty.
- Professional consultant’s certificate (PCC)
- A certificate from a qualified architect, surveyor or engineer who monitored the build, backed by professional indemnity insurance, which some lenders accept where there is no warranty.
Common exam trap
The trap: The builder is liable for every defect for ten years, or the owner’s buildings insurer pays for construction defects.
The builder’s own duty lasts two years. Defined structural damage in years three to ten is insured by the scheme provider. Buildings insurance covers insured perils such as fire and flood, and a construction defect is a different risk.
Why it matters: Identify the stage from the year, and the responsible party follows.
Worked calculation: Dating the stages from completion
Harriet Cole completes the purchase of a new Buildmark-covered house on 18 September 2026.
Step 1: End of the builder warranty
18 September 2026 + 2 years
= 18 September 2028
Stage 2 lasts two years from completion.
Step 2: Length of the insurance stage
10 years − 2 years
= 8 years
Stage 3 takes up the remaining eight years of the ten.
Step 3: End of all cover
18 September 2026 + 10 years
= 18 September 2036
The whole ten-year period is counted from completion, not from the end of the builder warranty.
Answer: The builder warranty ends on 18 September 2028 and the insurance stage, and with it all cover, ends on 18 September 2036.
Count the ten years from completion. Adding eight years to the completion date, instead of to the end of the builder warranty, would stop the cover two years early.
3 practice questions
These come from the 12-question topic quiz. Pick an answer, then open the explanation.
Question 1
Which description matches the structure of a standard ten-year NHBC Buildmark policy on a newly built home?
- ATen years of builder warranty, followed by a separate final year of insurance for major structural damage only
- BTwo years of insurance for structural damage, followed by eight years of builder warranty
- CInsolvency cover to completion, a two-year builder warranty, then eight years of insurance
- DA single ten-year builder warranty, with cover ending if the builder becomes insolvent
Show the answer
Answer: C
Buildmark has three stages: cover from exchange to completion if the builder becomes insolvent, a two-year builder warranty in which the builder must put right defects and NHBC stands behind that duty, and then eight years of insurance for physical damage caused by defects in specified parts of the home. The other orders reverse or merge those stages.
Question 2
A buyer applies for a mortgage on a new-build flat that has no acceptable warranty, though the lender’s criteria require one. What is the likely outcome?
- AThe lender may delay or decline until an acceptable warranty is in place
- BThe lender will proceed because the valuation shows the property is worth the agreed price in full
- CThe lender will accept a letter from the developer stating that the build meets building regulations
- DThe lender will lend but at a loan-to-value ratio reduced by five percentage points
Show the answer
Answer: A
The warranty is construction-risk protection beside the lender’s charge. If the lender’s criteria require an acceptable scheme and none is available, the security is incomplete, so the lender can delay, decline or add conditions until the gap is closed. A good valuation, a developer’s letter or a lower loan-to-value does not replace a required warranty.
Question 3
Why does a mortgage lender care whether a new-build home has an acceptable warranty?
- AIt replaces the need for buildings insurance for the first ten years of the loan
- BIt confirms that the purchase price agreed with the developer is a fair market price
- CIt gives construction-risk protection behind the lender’s charge over a new dwelling
- DIt repays the mortgage if the borrower cannot pay because of builder insolvency
Show the answer
Answer: C
A new home carries construction risk that an established home has already shown it can bear. A warranty from an acceptable scheme underwrites builder insolvency and defined structural defects, supporting the lender’s security. It does not replace buildings insurance, confirm the price, or clear the mortgage debt.
Test yourself
A buyer completes on a Buildmark-covered house on 3 March 2027. When does the builder warranty end and when does all cover end?
The builder warranty ends on 3 March 2029 and all cover ends on 3 March 2037, because both periods are counted from completion.
In year eight, an owner of a new-build house finds that a defect in the foundations has caused cracking. Who does she claim from?
She claims from the scheme provider under the insurance section, which runs to the tenth anniversary of completion. The builder’s own duty ended after year two, and buildings insurance does not cover construction defects.
A developer says its warranty comes from a respected trade-body scheme, which the buyer’s lender has not listed. Will the lender accept it?
Not necessarily. Each lender decides which schemes it accepts, and no central list exists, so the lender’s own list decides.
Sources
- CeMAP syllabus, LIBF / Walbrook Institute London (March 2026)
- NHBC Buildmark cover for homeowners, National House-Building Council
- Buildmark insurance product information document, National House-Building Council
- UK Finance Mortgage Lenders’ Handbook for England and Wales, section 6.7.1, UK Finance
- UK Finance Mortgage Lenders’ Handbook FAQs, UK Finance
- Professional Consultant’s Certificate, UK Finance
- How to buy a home, GOV.UK
Reviewed on 30 Oct 2026. Next review due 29 Oct 2027. Written by Archway Learn from the LIBF syllabus and the sources above.