Cert CII (Protection) IF9 revision notesReviewed

How can you manage workload and time better?

Syllabus topic: Explain techniques for managing workload and time more effectively.

In short

After a hectic week, Tamsin Rourke sits down with Declan Farrow at Lighthouse Insurance Services. He has been answering every email the moment it lands, saying yes to every request and leaving Nadeem Asante’s repair-payment query until the afternoon. Tamsin does not tell him to work harder.

Key facts

  • A time log shows where time goes; lost share equals lost hours divided by total hours.
  • Do urgent and important work first, schedule important but not urgent work, and delegate or drop the rest.
  • The 80/20 principle points to the small share of tasks that gives most of the value.
  • Batch similar tasks and protect agreed focus time for complex work.
  • Break large tasks into steps with deadlines to beat procrastination.
  • Plan from time available after fixed commitments, not the length of the day.
  • Raise capacity problems early and negotiate priorities; delegate with a clear brief and keep accountability.

Key terms

Time log
A record of how time is actually spent, used to find avoidable loss.
Urgent and important matrix
A four-box tool that decides whether to do, schedule, delegate or drop a task.
Pareto principle
The observation that about 80% of results come from about 20% of effort.
Batching
Grouping similar tasks into set blocks to reduce the cost of switching.
SMART objective
A goal that is specific, measurable, achievable, relevant and time-bound.
Assertiveness
Stating priorities and limits politely, including saying no or not yet with a reason.

Common exam trap

The trap: The 80/20 principle means spending 80% of the day on calls and 20% on administration, or keeping 20% of the day free for interruptions.

It is an observation that a small share of tasks produces most of the value. It tells you to identify those tasks and do them first.

A manager may set a call-to-administration split or a buffer separately, but that is a different rule.

Worked calculation: Declan’s time log

Declan logs his 37.5-hour week and finds 7.5 hours were lost to interruptions and re-work.

  1. Step 1: Divide lost time by total time

    7.5 ÷ 37.5

    = 0.2

    Use the whole week as the denominator, not the productive hours.

  2. Step 2: Convert to a percentage

    0.2 × 100

    = 20%

    One fifth of the week was lost.

  3. Step 3: Productive share

    100% − 20%

    = 80%

    This is the share of the week that went on useful work.

Answer: Declan lost 20% of his week, and 80% was productive.

Treating hours as a percentage gives 7.5%, and dividing by the 30 productive hours gives 25%. Both are wrong because the whole week is the base.

3 practice questions

These come from the 12-question topic quiz. Pick an answer, then open the explanation.

  1. Question 1

    Hannah, a complaints handler, starts her day with four tasks. Which should she tackle first?

    1. AA complaint whose final response is due today, the last day of the eight-week period
    2. BReturning a broker’s call about a renewal quote that is needed by next Friday
    3. CUpdating her training and competence log, which is due at the end of the quarter
    4. DReading a new claims procedure that comes into force at the start of next month
    Show the answer

    Answer: A

    Work that is both urgent and important comes first. A complaint reaching the end of the eight-week period under DISP has a regulatory deadline today and directly affects the customer. The broker’s quote, the training log and the new procedure all matter, but each has a later deadline and can be scheduled once the complaint response is sent.

  2. Question 2

    Grace’s manager asks her to take on 25 extra renewals by Friday on top of a full caseload. She can realistically complete 10. What should she do?

    1. AAccept all 25 and work through her lunch breaks until every renewal is finished
    2. BAccept all 25 and quietly complete only the easiest ones by the Friday deadline
    3. CRefuse the work outright, because it falls outside her normal agreed caseload
    4. DExplain her capacity now and agree priorities or a revised deadline for the rest
    Show the answer

    Answer: D

    Raising capacity early and agreeing priorities lets the manager reallocate work or reset expectations before customers are affected. Working through breaks risks errors and burnout. Accepting and quietly doing only part leaves renewals missed without warning, which can leave customers uninsured. Refusing outright is unhelpful and ignores the team’s need; negotiation is the professional response.

  3. Question 3

    Asha keeps putting off a large, complex task: rewriting the team’s renewal call guide. Which approach is most likely to help?

    1. AWaiting until a full free day comes up so that the guide can be rewritten in one sitting
    2. BBreaking it into smaller steps, each with its own deadline, and starting the first today
    3. CClearing all the quick tasks first, until the guide becomes urgent enough to start
    4. DAsking her manager to remove the task from her objectives until next year’s review
    Show the answer

    Answer: B

    Breaking a large task into manageable steps with deadlines makes it less daunting and builds momentum, which overcomes procrastination. A free day rarely appears in a service role. Waiting until it becomes urgent turns important work into a crisis. Asking for it to be removed avoids the task rather than managing it and leaves the team with an outdated guide.

Test yourself

Sana’s 40-hour week contains 6 hours of avoidable interruptions. What percentage was lost?

6 ÷ 40 × 100 = 15% of her week.

Wendy has 6.5 hours available after meetings and each customer review takes 25 minutes. How many reviews can she plan?

6.5 hours is 390 minutes, and 390 ÷ 25 = 15.6, so she can plan 15 complete reviews.

Which SMART element is missing from “improve my complaint handling this year”?

It has no specific measure and no firm date, so it is neither measurable nor properly time-bound.

Sources

Reviewed on 28 Oct 2026. Next review due 28 Oct 2027. Written by Archway Learn from the CII syllabus and the sources above.